|
The
first step in the process of pilot plant testing is often the
development of vapor-liquid or liquid-liquid equilibrium data.
Due to the non-ideal nature of many of the systems
encountered, experimental equilibrium data is required for design. If
this data is not in literature it must be measured in the laboratory.
Thus, it is often necessary to perform bench scale tests to fill gaps in
the available data. LLE data for extraction and VLE data for
distillation can be developed in our pilot facility. This data is then
incorporated into computer models to optimize the process and establish
operating conditions for the pilot plant tests to follow.
Also important during LLE and VLE tests are observations
by KMPS's trained experts. For example, observations such as foaming or
fouling often prove to be extremely valuable in avoiding potential
operating problems in the pilot plant and/or commercial equipment.
|